Mainframe - 2012 z/OS Upgrades

This article provides information about upgrades to the 2012 z/OS mainframe.

2012 z/OS Upgrades

 

01/02/2012

New Year's Day was Sunday, 01/01/2012. The Official University New Year Holiday was Monday, 01/02/2012. We provided minimal coverage in the 1155 E 60th Street Data Center consisting of one Computer Operator per 8-hour Shift to respond to System prompts, environmental alarms and telephone calls. The UCHIBETA LPAR was available for Open Testing on Monday, 01/02/2012, from 8:00 AM until 5:00 PM with its full complement of Online Regions. The Production Shop was not staffed on 01/02. ALSO, on Monday, 01/02/2012, we performed an IPL of the UCHIMVS1 (Production) LPAR at 6:00 AM.

01/05/12

During System Test Time on Thursday, 01/05/12, we began the process of increasing the size of the Mainframe Spool. We formatted a new Spool Volume and issued a "Drain" Command for the current Spool allowing it to be emptied during the next week. New Output will be directed to the new Spool Volume. We have scheduled System Test Time for Thursday, 01/12/12, to increase the size of the current Spool Volume once it has been emptied.

01/08/12

During System Test Time on Sunday, 01/08/2012, we expanded the range of OPS/MVS to support our future upgrade to ACF2 R15. OPS/MVS is an internal facility used by the Mainframe Systems Group to automate System responses. The UCHIBETA LPAR was available for Open Testing from 8:30 AM until 5:00 PM on Sunday, 1/8.

01/11/12

On Wednesday, 01/11/12, we made ACF2 Release 5 and maintenance to z/OS 1.12 available for Open Testing in the UCHIBETA LPAR. ACF2 R15 and z/OS 1.12 Maintenance will be needed for our future upgrade to z/OS 1.13. If Open Testing goes well, we will apply z/OS 1.12 maintenance and install ACF2 R15 in Production during System Test Time on Thursday, 01/26/12, from 6:00 until 7:30 AM.

01/12/12

During System Test Time on Thursday, 01/12/12, we continued the expansion of Spool space which was started on 1/5/12. We increased the size of the current Spool Volume which was set to "Drain" on 1/5. This in addition to the new Spool Volume installed on 1/5 will significantly increase overall Spool Space on the Mainframe.

01/16/12

Monday, 1/16/12, was the Martin Luther King Holiday. We provided minimal coverage in the 1155 Data Center consisting of one Computer Operator per 8-hour shift to respond to system prompts, environmental alarms, and telephone calls. The UCHIBETA LPAR was available for Open Testing from 8:00 AM until 5:00 PM with its full complement of Online Regions available. The Production Shop was not staffed on the Holiday. ALSO, on Monday, 01/16/12, we performed an IPL of the UCHIMVS1 LPAR at 6:00 AM.

01/23/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 01/23/12, at 6:00 AM.

01/26/12

During System Test Time on Thursday, 01/26/12, we installed ACF2 Release 15 and applied routine Maintenance to z/OS 1.12 in Production.  ACF2 R15 and z/OS 1.12 Maintenance will be needed for our future Operating System upgrade to z/OS 1.13; both ACF2 R15 and z/OS 1.12 Maintenance had been available for Open Testing in the UCHIBETA LPAR since Wednesday, 01/11/12.

01/30/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 01/30/12, at 6:00 AM.

01/31/12

During System Test Time on Tuesday, 01/31/12, we corrected the CI Size of a new Dataset used to collect Mainframe SMF Records.

Back To Top

02/01/12 

We made Release 5.0 of Xpediter/Xchange available for Open Testing in the UCHIBETA LPAR on Wednesday, 02/01/12, replacing Release 4.0 there. Xpediter/Xchange allows programmers to change the current date for batch or online processing in CICS.  We have tentatively scheduled Production installation of Xpediter/Xchange 5.0 for Wednesday, 2/15/12; we will not need System Test Time for this Production installation. Please email mfcticket@uchicago.edu to report problems with Xpediter/Xchange.

02/06/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 02/06/12, at 6:00 AM.

02/07/12

We removed Xpediter/Xchange 5.0 from the UCHIBETA LPAR on Tuesday, 02/07/12, and reverted to Xpediter/Xchange 4.0, while Compuware investigates a communication problem we have been experiencing with Release 5.0.

02/13/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 02/13/12, at 6:00 AM.

02/20/12

We performed an IPL of the UCHIMVS1 (Production) LPAR for Monday, 02/20/12, at 6:00 AM.  Also, on Monday, 2/20/12, we experienced a problem with communications between the Maingate Server (I-Trust application) and the Mainframe which the Systems Group is investigating.

02/23/12

Starting Thursday 02/23/12, we will use the UCHIBETA LPAR to test a work-around for the recent communication issue experienced between the Maingate Server (I-Trust application) and the Mainframe. Per Systems Group's Bob Cachur: the essence of the workaround is this:

  1. Continue to start the Policy Agent (PAGENT) using the autostart mechanism of the TCPIP stack.

  2. Move the task of starting the Internet Key Exchange Daemon (IKED) from the TCPIP stack to the auspices of OPS/MVS, our system automation tool.

This will ensure that PAGENT is up and running before the start of IKED. It is suspected that our problem yesterday was due to PAGENT not being available for IKED. I.e. they were initialized out of sequence during the Monday morning UCHIMVS1 IPL.

02/27/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 02/27/12, at 6:00 AM.

02/29/12

Bill Barkley and Compuware have resolved the communication problem encountered during Open Testing of Xediter/Xchange 5.0 in the UCHIBETA LPAR. On Tuesday, 02/07/12, we reverted to Release 4.0 of Xpediter/Xchange in BETA while the problem was investigated. We made Xpediter/Xchange 5.0 available for Open Testing in UCHIBETA on Wednesday, 02/29/12, replacing Release 4.0 there. Xpediter/Xchange allows programmers to change the current date for batch or online processing in CICS. Pending sucessful Open Testing in BETA, we will install Xpediter/Xchange 5.0 in Production during System Test Time on Sunday, 03/18/12, from 7:00 until 8:00 AM.

Back To Top

03/05/12

We performed an IPL of the UCHIMVS1 (Production) LAR on Monday, 03/05/12, at 6:00 AM. Effective with this IPL, the new procedure for establishing contact with the Maingate Server for the I-Trust Application during Mainframe IPLs went into Production. The procedure had been tested daily in the UCHIBETA LPAR since Thursday 02/23/12.

03/11/12

Daylight Saving Time began at 2:00 AM on Sunday, 03/11/12. The Mainframe continued to display Central Standard Time until we IPLed the UCHIMVS1 (Production) LPAR. We performed that IPL of UCHIMVS1 on Sunday, 03/11/12, at 6:30 AM Central Standard Time as shown on the Mainframe time display. This schedule allowed us time to complete all Production Backups before the IPL. Effective with this IPL, the Mainframe displays Daylight Saving Time (Spring Forward!). Any ESP Job Scheduler Events or Applications scheduled to run during the "missing" hour was run after the IPL.  The UCHIBETA LPAR was available for Open Testing starting at 8:10 AM CDT.

03/18/12

During System Test Time on Sunday, 03/18/12, we installed Xpediter/Xchange 5.0 in Production, replacing Release 4.0. Xpediter/Xchange allows programmers to change the current date for batch or online processing in CICS. Xpediter/Xchange 5.0 had been available for Open Testing in the UCHIBETA LPAR since Wednesday, 02/29/12. On Sunday, 03/18, the UCHIBETA LPAR was available for Open Testing from 8:38 AM until 5:00 PM. Please email mfcticket@uchicago.edu to report problems with Xpediter/Xchange.

03/26/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 03/26/12, at 6:00 AM.

Back To Top

04/02/12

We peformed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 04/02/12, at 6:00 AM.

04/09/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 04/09/12, at 6:00 AM.

04/10/12

On Tuesday, 04/10/12, we made Release 11.9 of System Automation Software OPS/MVS and Release 14 of CA Common Services (CCS) available for Mainframe Systems Group testing in the UCHIBETA LPAR. If our testing goes well, we will install OPS/MVS 11.9 and CCS 14 in Production during System Test Time on Sunday, 04/22/12, from 7:30 AM until 12:00 Noon.

04/16/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 04/16/12, at 6:00 AM.

04/19/12

On Thursday, 04/19/12, we applied Maintenance to Abend-Aid 12.1 in the UCHIBETA LPAR for extended Open Testing. If testing goes well, we will schedule the Maintenance to be applied in Production on Sunday, 5/27/12, during System Test Time, start time and duration to be announced.

04/22/12

During System Test Time on Sunday, 04/22/12, we installed Release 11.9 of System Automation Software OPS/MVS and Release 14 of CA Common Services (CCS) in Production. OPS/MVS 11.9 and CCS 14 have been active in the UCHIBETA LPAR since Tuesday, 04/10/12 The UCHIBETA LPAR was available for Open Testing on Sunday, 04/22, from 9:00 AM until 5:00 PM.

04/30/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 04/30/12, at 6:00 AM.

Back To Top

05/07/12 

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 05/07/12, at 6:00 AM.

05/14/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 05/14/12, at 6:00 AM.

05/17/12

DCS' Mainframe Systems Group had Exclusive Use of the UCHIBETA LPAR on Thursday, 5/17/12, to test ESP 11.3. Open Testing in UCHIBETA resumed on Friday, 5/18/12.

05/21/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 05/21/12, at 6:00 AM.

05/27/12

During System Test Time on Sunday, 5/27/12, we applied Maintenance to Abend-Aid 12.1 in Production.  Due to communication issues with the new consoles, we have delayed configuring and installing new Operator Consoles for the Mainframe.  Abend-Aid 12.1 Maintenance has been active in the UCHIBETA LPAR since Thursday, 04/19/12.    The UCHIBETA LPAR was available for Open Testing from 11:15 AM until 5:00 PM on Sunday, 5/27. 

Memorial Day Holiday

Monday, 5/28/12, was the Memorial Day Holiday. We provided minimal coverage in the 1155 E 60th Street Machine Room consisting of one Computer Operator per 8-Hour Shift to respond to System Prompts and environmental alarms. The UCHIBETA LPAR was available for Open Testing from 8:00 AM until 5:00 PM with its full complement of Online Regions available on Memorial Day.

Back To Top

06/03/12  

We scheduled System Test Time for Sunday, 6/3/12, from 8:00 AM until 12:00 Noon to work on the Mainframe's Hardware Management Console. Test Time ran long so the UCHIMVS1 (Production) LPAR was available at 12:20 PM.  The UCHIBETA LPAR was available for Open Testing from 12:44 until 5:00 PM.

06/10/12

During System Test Time on Sunday, 06/10/12, SEI replaced one of the two redundant Bulk Power Regulators in the z9 Mainframe. The UCHIBETA LPAR was available for Open Testing from 12:00 Noon until 5:00 PM.

06/17/12

During System Test Time on Sunday, 06/17/12, we reconfigured the Operator Work Stations in the I/O Room with new equipment. The UCHIBETA LPAR was available for Open Testing from 9:37 AM until 5:00 PM.

06/25/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 06/25/12, at 6:00 AM.

06/28/12

We applied Maintenance to DTS/SCC 5.1 in the UCHIBETA LPAR on Thursday, 06/28/12, for System Group testing. DTS/SCC is our Mainframe DASD Pooling and Budgeting software. We have not yet set a target date for applying this Maintenance in Production.

Back To Top

07/02/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 07/02/12, at 6:00 AM.

07/04/12

Wednesday, 07/04/12, was the Independence Day Holiday. We provided minimal coverage in the 1155 Data Center consisting of one Computer Operator per 8-hour shift to respond to system prompts and environmental alarms. The UCHIBETA LPAR was available for Open Testing from 8:00 AM until 5:00 PM on Wednesday, 7/4/12.

07/09/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 07/09/12, at 6:00 AM.

07/12/12

On Thursday, 07/12/12, we made ESP 11.3 available for extended Open Testing in the UCHIBETA LPAR, replacing our current Production level ESP 5.5 there.  The move from ESP 5.5 to ESP 11.3 is not as drastic as the numbers may suggest: The renumbering happened when Computer Associates (CA) acquired ESP from Cybermation and does not indicate a large jump in Releases ESP 11.3 has been active in the Mainframe TEST LPAR for the Mainframe Systems Group's internal testing for an extended period of time. CA's support for our current level is due to expire at the end of August, 2012.

07/13/12

The Annual IT Services Family Picnic was Friday, 07/13/12, from 2:00 until 5:00 PM. The 1155 Data Center ran unattended during that time. The UCHIBETA LPAR was available for Open Testing from 8:00 AM until 6:00 PM on Friday, 7/13.

07/16/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 07/16/12, at 6:00 AM.

07/22/12

During System Test Time on Sunday, 07/22/12, we applied Maintenance to DTS/SCC 5.1 in Production. DTS/SCC is our Mainframe DASD Pooling and Budgeting software. This Maintenance had been active in the UCHIBETA LPAR since Thursday, 06/28/12. UCHIMVS1 was available shortly after 8:00 AM; UCHIBETA was available for Open Testing from 8:30 AM until 5:00 PM on Sunday, 7/22.

07/30/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 07/30/12, at 6:00 AM.

Back To Top

08/06/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 08/06/12, at 6:00 AM.

08/13/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 08/13/12, at 6:00 AM.

08/20/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 08/20/12, at 6:00 AM.

08/27/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 08/27/12, at 6:00 AM. An error in ending the ESP Hiatus following the IPL caused a delay in availability of the CICS Online Regions in UCHIMVS1; a Resource Count remained at "Zero" and prevented the Onlines going into execution. ProdShop manually reset the Resource Count to its default setting and the Onlines went into execution at 0840.

08/28/12

During System Test Time on Tuesday, 08/28/12, we corrected TCPDATA file definitions to resolve problems encountered while doing internal testing of SAS 9.3. The file definitions had been tested in both the TEST and UCHIBETA LPARs.

08/30/12

On Thursday, 08/30/12, we made SAS 9.3 available for extended Open Testing in the UCHIBETA LPAR, replacing SAS 9.1.3. We have not yet set a date for installing SAS 9.3 in Production.

Back To Top

09/03/12

Monday, 09/03/12, was the Labor Day Holiday. We provided minimal coverage in the 1155 E 60th Street Machine Rooms consisting of one Computer Operator per 8-hour shift to respond to system prompts, environmental alarms, and telephone calls. The UCHIBETA LPAR was available for Open Testing from 8:00 AM until 5:00 PM with its full complement of Online Regions active. The ProdShop was not staffed on the Holiday. ALSO, on Monday, 09/03/12, we performed an IPL of the UCHIMVS1 (Production) LPAR at 6:00 AM.

09/10/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 09/10/12, at 6:00 AM.

09/11/12

We applied recommended Maintenance to SyncSort 1.4.0.1 in the UCHIBETA LPAR for Open Testing on Tuesday, 09/11/12. ALSO, on Tuesday, 09/11/12, we installed TMON for CICS 3.3 (replacing 3.2) and TMON for ZOS 4.4 (replacing 4.3) in UCHIBETA for internal testing by the Mainframe Systems Group.

09/17/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 09/17/12, at 6:00 AM.

09/18/12

During System Test Time on Tuesday, 09/18/12, we installed TMON for CICS 3.3 (replacing 3.2) and TMON for ZOS 4.4 (replacing 4.3) in Production. Both TMONs had been active in the UCHIBETA LPAR for Mainframe Systems Group testing since Tuesday, 09/11/12.

09/24/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 09/24/12, at 6:00 AM.

09/25/12

During System Test Time on Tuesday, 9/25/12, we applied recommended Maintenance to SyncSort 1.4.0.1 in Production.  This Maintenance had been available for Open Testing in the UCHIBETA LPAR since Tuesday, 09/11/12.

Back To Top

10/01/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 10/01/12, at 6:00 AM.

10/08/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 10/08/12, at 6:00 AM.

10/10/12

IT Services' Mainframe Systems Group had Exclusive Use of the UCHIBETA LPAR on Wednesday, 10/10/12, to test a process for making the File Transfer Protocol (FTP) available daily in BETA. We tested a method for defining specific IP Addresses as valid FTP targets in ACF2 and in the TCPIP NETACCESS control file in UCHIBETA. As UCHIBETA testing went well on 10/10, this new process will take effect in BETA on Thursday, 10/11/12, allowing us to make FTP available in BETA every day.

10/11/12

FTP has been enabled in the UCHIBETA LPAR as of Thursday, 10/11/12.  All external IP Adresses are "locked down" except for those defined in UCHIBETA by ACF2 and TCPIP NETACCESS control files.  This process was tested in UCHIBETA during the Mainframe Systems Group's Exclusive Use of BETA on Wednesday, 10/10/12.

10/15/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 10/15/12, at 6:00 AM.  ALSO, on Monday, 10/15, we had to "back out" the change which had enabled FTP in UCHIBETA on Thursday, 10/11, due to security concerns.  Additional testing of the ACF2 - NETACCESS process will be done during DCS' Exclusive Use of UCHIBETA on Thursday, 10/18/12.

10/17/12

There was a delay in making the UCHIBETA LPAR available for Open Testing on Wednesday, 10/17/12. A change we made to an ESP PARMLIB in BETA on Tuesday, 10/16, contained an invalid Keyword which prevented BETA from coming up cleanly on 10/17; once the Keyword was corrected, we successfully re-IPLed BETA and the LPAR was made available for Open Testing at 8:15 AM.

10/18/12

Data Center Services' Mainframe Systems Group had Exclusive Use of the UCHIBETA LPAR on Thursday, 10/18/12, to test ACF2 changes for NETACCESS authorization for use of FTP in that LPAR. No changes in current FTP restrictions in BETA resulted from this Exclusive Use.

10/22/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 10/22/12, at 6:00 AM.

10/25/12

Data Center Services' Mainframe Systems Group had Exclusive Use of the UCHIBETA LPAR on Thursday, 10/25/12, to activate NETACCESS Resource Rules in support of making FTP available every day in that LPAR. NETACCESS had been made available in BETA effective 10/11 but was removed on 10/15 due to security concerns over certain batch LoginIDs having "high end" ACF2 privileges which allowed them to bypass NETACCESS rules. During DCS' Exclusive Use of BETA on 10/18, we successfully tested a process for removing those unnecessary privileges allowing NETACCESS to work as intended. Based on the success of the testing done in BETA on 10/25, we will enable FTP in BETA on Tuesday, 10/30. On 10/25, we also tested a new "Resolver" configuration for DNS lookups in UCHIBETA.

10/29/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 10/29/12, at 6:00 AM.

10/30/12

Based on the success of the testing which was done in UCHIBETA during DCS Exclusive Use on Thursday, 10/25/12, we have enabled FTP in BETA on Tuesday, 10/30. Effective on that date, all external IP Addresses are "locked down" except for those defined in BETA's ACF2 and NETACCESS control files.

Back To Top

11/04/12

Daylight Saving Time ended on Sunday, 11/04/12, at 2:00 AM (Fall Back!). In order to revert to Standard Time on the IBM z9 Mainframe, we needed to perform an IPL of the system. Until that IPL, the Mainframe continued to display Daylight Saving Time. We performed that IPL of the UCHIMVS1 (Production) LPAR on Sunday, 11/04/12, at 7:00 AM "DST." That schedule allowed time for the Weekly Offsite DASD Backups to complete. Effective with that IPL, the Mainframe now displays Central Standard Time.

11/12/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 11/12/12, at 6:00 AM.

11/19/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 11/19/12, at 6:00 AM.

11/22-23/12

Thursday, 11/22, and Friday, 11/23, were the two days of the 2012 Thanksgiving Holiday. We provided minimal coverage in the 1155 Machine Rooms consisting of one Operator per 8-hour shift to respond to System prompts, environmental alarms, telephone calls and visits to the I/O Window.

11/26/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 11/26/12, at 6:00 AM.

Back To Top

12/03/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 12/03/12, at 6:00 AM.

12/10/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 12/10/12, at 6:00 AM.

12/12/12

During Hardware Test Time on Wednesday, 12/12/12, which started at 4:00 AM and concluded at 5:30 AM,  we replaced a failed (and redundant) blower motor.  Production Onlines were available at their scheduled times.  The UCHIBETA LPAR was available for Open Testing starting at 8:30 AM on  Wednesday, 12/12/12, with all Online Regions available. 

12/17/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 12/17/12, at 6:00 AM. 

12/18/12

During System Test Time on Tuesday, 12/18/12, we installed ESP 11.3 in Production, replacing ESP 5.5.  ESP 11.3 had been available for extended Open Testing in the UCHIBETA LPAR since Thursday, 07/12/12, and had been previously tested internally in the Mainframe's TEST LPAR.  The move from ESP 5.5 to ESP 11.3 is not as drastic as the numbers may suggest: The renumbering happened when Computer Associates (CA) acquired ESP from Cybermation and does not indicate a large jump in Releases.

12/24/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 12/24/12, at 6:00 AM. 

12/25/12

Tuesday, 12/25/12, was the Christmas Holiday.  We provided minimal coverage consisting of one Computer Operator per 8-Hour Shift to respond to system prompts, environmental alarms, and telephone calls.  The UCHIBETA LPAR was available for Open Testing from 8:00 AM until 5:00 PM with its full complement of Online Regions available. 

12/31/12

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 12/31/12, at 6:00 AM. 

Back To Top

See Also:




Keywords:upgrade history   Doc ID:21980
Owner:Todd L.Group:University of Chicago
Created:2011-12-28 08:55 CSTUpdated:2014-07-21 08:10 CST
Sites:University of Chicago, University of Chicago - Sandbox
Feedback:  0   1