Mainframe - 2006 z/OS Upgrades

This article provides information the upgrade history for the 2006 z/OS mainframe.

New Year's Day

Sunday, 01/01/06, was New Year's Day; Monday, 01/02/06, was the offical University New Year Holiday. We maintained minimal Computer Room staffing on both days consisting of one Operator per Shift. UCHIMVS1 was available with no Online Regions; UCHIBETA was available for Open Testing from 8:00 AM until 5:00 PM with Online Regions active on both days.

01/02/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 01/02/06, at 6:00 AM.

01/08/06

During System Test Time on Sunday, 01/08/06, Networking Services upgraded Machine Room switches.

01/09/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 01/09/06, at 6:00 AM

01/12/06

During System Test Time on Thursday, 01/12/06, we installed Release 5.1 of Abend-AID for CICS in Production, replacing Release 4.5.

01/16/06

Monday, 01/16/06, was the Martin Luther King Jr Holiday. The Data Center provided minimal Operator Coverage in the 1155 E 60th Street Machine Room that day.

ALSO, we performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 01/16/06, at 6:00 AM.

01/22/06

During System Test Time on Sunday, 01/22/06, we installed ACF2 R8.0 SP2 and CA Common Services R11 SP6 in Production. Both had been available in the UCHIBETA LPAR for Open Testing since Wednesday, 12/07/05.

01/24/06

Version 1.2 of “SYNCSORT for z/OS” became the default in the UCHIBETA LPAR on Tuesday, 01/24/06. Version 1.2 of “SYNCSORT for z/OS” had been available for testing in both the UCHIMVS1 and UCHIBETA LPARs since Wednesday, 12/21/05. No special instructions will be needed to test Version 1.2 of “SYNCSORT for z/OS” in UCHIBETA as of Tuesday, 01/24/06.

01/30/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday,01/30/06, at 6:00 AM.

Back To Top

02/01/06

On Wednesday, 2/1/06, we removed the Version 1.0 ISPF panels for RMM’s Managed Tape Library Dialog (L.RMM from the ISPF Primary Option Menu) and replaced them with the Version 2.0 panels. We no longer maintain both versions of this dialog under our Local Options menu.

02/06/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 02/06/06, at 6:00 AM.

02/07/06

During System Test Time on Tuesday, 02/07/06, we installed Version 1.2 of “SYNCSORT for z/OS” in Production, replacing Version 1.1. SYNCSORT 1.2 has been available for testing in both the UCHIMVS1 and UCHIBETA LPARs since Wednesday, 12/21/05. SYNCSORT 1.2 has been the default in UCHIBETA since Tuesday, 01/24/06.

02/13/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 02/13/06, at 6:00 AM.

02/14/06

The Data Center’s Mainframe Systems Group had Exclusive Use of the UCHIBETA LPAR on Tue, 2/14/06, to experiment with Virtual Tape. Open Testing in BETA resumed on Wed, 2/15/06, at 8:00 AM.

02/20/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 2/20/06, at 6:00 AM. ALSO, the 1155 E 60th Street Machine Room and the IBM z800 Mainframe ran without UPS Battery backup on Monday morning, 2/20/06. The problem was a bad fuse in the UPS. Battery Backup was restored at 12:00 Noon on Monday, 2/20/06, with no interruption to Mainframe services.

02/23/06

The 1155 E 60th Street Machine Room and the IBM z800 Mainframe ran without UPS Battery backup on Thursday, 2/23/06. Battery Backup was restored at 4:30 PM with no interruption to Mainframe services.

02/25/06

The 1155 E 60th Street Machine Room and the IBM z800 Mainframe are again running without UPS Battery support as of 6:00 AM on Saturday, 2/25/06.

02/27/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 2/27/06, at 6:00 AM. ALSO, on Monday, 2/27/06, we continue to run without UPS support in the 1155 E 60th Street Machine Room. A replacement part has been ordered and is expected on site for installation today. The replacement part was installed and the UPS is active in support of the 1155 E 60th Street Machine Room as of 6:15 PM.

02/28/06

The UPS system failed at just after Midnight Tuesday morning, 2/28/06. We have ordered additional parts for the repair but we may not receive all necessary components until Friday, 3/10/06.

Back To Top

03/06/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 3/6/06, at 6:00 AM.

03/07/06

Data Center Mainframe Systems Group had Exclusive Use of the UCHIBETA LPAR on Tuesday, 3/7/06.

03/13/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 3/13/06, at 6:00 AM.

03/20/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 3/20/06, at 6:00 AM. ALSO on Monday, 3/20/06, we applied maintenance to Compuware’s CSS/Xpediter-TSO in Production.

03/22/06

On Wednesday, 3/22/06, full UPS Backup was restored to the 1155 E 60th Street Machine Room.

03/23/06

The Data Center’s Mainframe Systems Group had Exclusive Use of the UCHIBETA LPAR on Thu, 3/23/06, to test the application of z/OS Maintenance. Open Testing in BETA resumed at 8:00 AM on Fri, 3/24/06.

03/27/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 3/27/06, at 6:00 AM.

Back To Top

04/02/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Sunday, 4/02/06, at 6:00 AM Central Standard Time. Effective with this IPL, the Mainframe moved to Daylight Saving Time (Spring Forward!) at 7:16 AM.

04/04/06

On Tuesday, 04/04/06, we applied Routine Maintenance to z/OS 1.6 and made Release 8A of IOF (Interactive Output Facility) available for Open Testing in the UCHIBETA LPAR. If testing goes well, we will install z/OS Maintenance and IOF 8A in Production during System Test Time on Sunday, 5/7/06.

04/10/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 4/10/06, at 6:00 AM.

04/11/06

During System Test Time on Tuesday, 4/11/06, we prepared the Virtual Tape appliance for future use in Production. ALSO on Tuesday, 4/11/06, we realized that IOF 8A and maintenance for z/OS 1.6 had not been made available in the UCHIBETA LPAR as scheduled starting on Wednesday, 4/5/06, through Monday, 4/10/06. There had been a miscommunication with Operations Staff resulting in their following the wrong UCHIBETA IPL instructions. This situation has now been corrected and IOF 8A and z/OS 1.6 maintenance will be available for Open Testing through Saturday, 5/6/06.

04/17/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 04/17/06, at 6:00 AM. ALSO, on Monday, 4/17, we made SAS 9.1.3 the default version of SAS in the UCHIBETA LPAR.

04/20/06

During System Test Time on Thursday, 4/20/06, we formatted RMM for the future use of Virtual Tape in Production, allowing our Mainframe Systems Group to test Virtual Tape functions in the BETA LPAR.

04/24/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 04/24/06, at 6:00 AM.

Back To Top

05/01/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, May Day, 5/01/06, at 6:00 AM. No proletariat were exploited in creating this message.

05/02/06

A problem with the Mainframe’s Hardware Management Console delayed availability of the UCHIBETA LPAR until 9:15 AM on Tuesday, 5/2/06. IBM was notified of the problem and worked with our Mainframe Systems Group to reboot the HMC.

05/04/06

DuringSystem Test Time on Thursday, 5/4/06, we relocated some System datasets.

05/07/06

During System Test Time on Sunday, 5/7/06, we installed z/OS Maintenance and IOF 8A in Production. IOF 8A and z/OS Maintenance have been active in the UCHIBETA LPAR since Tuesday, 4/11/06.

05/15/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 5/15/06, at 6:00 AM.

05/22/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 5/22/06, at 6:00 AM.

05/23/06

The Data Center’s Mainframe Systems Group had Test Time scheduled on the UCHIBETA LPAR until 9:00 AM on Tuesday, 5/23/06. UCHIBETA was actually made available for Open Testing from 8:00 AM until 5:00 PM on Tuesday, 5/23/06.

Memorial Day Holiday

The Memorial Day Holiday was Monday, 5/29/06. We provided minimal Operator coverage in the 1155 E 60th Street Computer Room consisting of one Operator per Shift for that 24 hour period. The UCHIBETA LPAR was available for Open Testing with the full range of Online Regions available.

05/29/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 5/29/06, at 6:00 AM.

05/31/06

During System Test Time on Wednesday, 5/31/06, we renewed the SSL Certificate needed for Mainframe FTP and tn3270. You may need to change the Session Options in your HostExplorer to be able to connect to the Mainframe via tn3270. (Please NOTE that if you have been able to access the UCHIBETA LPAR since Tuesday, 5/23, you should not need to make any changes at this time.) If you have upgraded to HostExplorer 2006, available from NSIT’s Site Licensing web site, or if you are running HostExplorer 9.0.0.0, or HostExplorer 8.0.0.3, please follow these instructions:

In HostExplorer 9.0, Open your session options and click on Security and then SSL/TLS. If there is a checkmark next to “Accept Unverified Server Certificates”, you will not have any problems connecting using the new mainframe certificate (currently on uchibeta and as of 5/31/06, on uchimvs1). If it is unchecked, you will not work.

In HostExplorer 2006 (aka 11.0), Open your session options and click on Security and then SSL/TLS. If there is not a checkmark next to “Verify Server Certificate”, you will not have any problems connecting using the new mainframe certificate (currently on uchibeta and as of 5/31/06, on uchimvs1). If it is checked, you will not work.

In HostExplorer 8.0.0.3, Open your session options and click on Security and then SSL/TLS. If there is a checkmark next to “Close Connection if Negotiation Fails”, you will have problems connecting using the new mainframe certificate (currently on uchibeta and on uchimvs1 as of 5/31/06). If it is unchecked, you will work.
To see which version of HostExplorer you are running, open a Mainframe session, open the pull-down menu under “HELP” and select “? About…” to display an information panel containing the version number. If you are running HostExplorer 8.0.0.0 or HostExplorer 9.0.0.22, you should not need to upgrade. Unfortunately, an upgrade to HostExplorer 2006 will not carry over any special function key definitions (F1, F2, etc) and you will need to reprogram those for your keyboard. Desktop Support will be upgrading the leased machines under their care. Call 4-TECH (4-8324) for assistance if needed.

When launching Mainframe FTP, you will be presented with a dialog box titled “Non-Trusted Certificate”. This box contains certificate attribute information and has three radio buttons to select from: “Allow this connection only”; “Trust this certificate”; and “Do not allow this connection”. For those who always select “Allow this connection only”, the only difference to be seen will be updated attributes in the Certificate Information field. For those who had previously selected “Trust this certificate” before the upgrade on 5/31, this will be the first time to see this dialog since the first time FTP was launched after the last certificate renewal in September, 2003. Selecting “Trust this certificate” means you will not see this dialog box again until the next certificate renewal in March, 2009.
06/05/06 We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 06/05/06, at 6:00 AM.
06/08/06 During System Test Time on Thursday, 06/08/06, we installed the backup Virtual Tape appliance and configured the new DASD Array on the Mainframe.
06/12/06 During System Test Time on Monday, 6/12/06, we made SAS 9.1.3 the Mainframe Production default replacing SAS 8.0.2 in the UCHIMVS1 (Production) LPAR. SAS 9.1.3 had been available for testing in both the UCHIBETA and UCHIMVS1 LPARs since 10/27/05, and has been the default in BETA since 4/17/06. We have also applied Service Pack 3 to SAS 9.1.3. Neither SAS-ETS nor SAS-CONNECT have been activated in SAS 9.1.3.

Back To Top

06/13/06

The Data Center’s Mainframe Systems Group had Exclusive Use of the UCHIBETA LPAR on Tuesday, 6/13/06, to do some pre-production testing on the new DASD array. Open Testing in BETA resumed on Wednesday, 6/14/06.

06/19/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 6/19/06, at 6:00 AM.

06/22/06

During System Test Time on Thursday, 6/22/06, we reconfigured the new IBM DS6800 DASD array.

06/23/06

The Annual NSIT Staff Picnic was Friday, 6/23/06, from 2:00 until 6:00 PM. We had minimal (one Operator) coverage in the Computer Room during that time to monitor tape mounts, print requests, the I/O Window, telephone calls, and environmental conditions. The UCHIBETA LPAR was available for Open Testing until 6:30 PM on Friday, 6/23/06.

06/26/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 6/26/06, at 5:30 AM.

ALSO, on Monday, 6/26/06, we connected the new Mainframe disk array, the IBM DS6800, to the UCHIBETA LPAR for one day of Open Testing. No volume names were changed; no JCL changes were needed. Online Region procedures (access, update, inquiry, etc) were tested during the morning while the Data Center tested backups and restores on non-public volumes. In the afternoon, batch processing was tested after Onlines were taken down. Jobstreams could be scheduled with ProdShop or run by end users. One DP100 Printer and any 3480 drives needed for testing were atttached to BETA for the day (but, of course, UCHIMVS1 took priority for resource allocation). Please NOTE that the TRNSFR Volume was not available on BETA during this Open Test: Data transfers from BETA to UCHIMVS1 were not possible because the DS6800 was not available on UCHIMVS1. ALSO, due to the fact that we needed to back out the DS6800 from UCHIBETA following Open Testing, we did not extend UCHIBETA past 5:00 PM.

06/27/06

SAS 9.1.3 Service Pack 4 was made available for testing in both the UCHIMVS1 and UCHIBETA LPARs. SAS 9.1.3 SP3 remained the default version in both LPARs. 

Back To Top

07/03/06

During System Test Time on Monday, 07/03/06, we installed a new TCP/IP Proc.

07/04/06

We provided minimal Operator coverage (one Operator per Shift) across the 24 hours of Tuesday, 7/4/06, the Independence Day Holiday. UCHIBETA was available for Open Testing from 8:00 AM until 5:00 PM with the full range of Online Regions available.

07/09/06

During System Test Time on Sunday, 7/9/06, which lasted from from 7:00 until 11:00 AM (one hour longer than had been announced), we installed the new IBM DS6800 Mainframe Disk Array in Production.

07/17/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 7/17/06, at 6:00 AM.

07/19/06

Availability of UCHIBETA delayed until 9:30 AM due to changes in disk configuration.

07/24/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 7/24/06, at 6:00 AM.

07/26/06

The Data Center had Exclusive Use of the UCHIBETA LPAR on Wednesday, 7/26/06. We were not able to test disk backups to and restores from the Virtual Tape facility in UCHIBETA but we did apply maintenance to ACF2 in support of SSH (Secure Shell) functionality. ACF2 maintenance will be active in UCHIBETA and will be applied in Production during System Test Time on Sunday, 7/30/06, 7:00 AM until 12:00 Noon. Open Testing in BETA resumed on Thursday, 7/27/06, at 8:00 AM.

07/30/06

During System Test Time on Sunday, 7/30/06, we applied maintenance to ACF2 in support of SSH (Secure Shell) functionality. Application of this maintenance had been tested in the UCHIBETA LPAR on 7/26/06, during Data Center Exclusive Use.

Back To Top

08/07/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 8/7/06, at 6:00 AM.

08/08/06

The Data Center’s Mainframe Systems Group had Exclusive Use of the UCHIBETA LPAR on Tuesday, 8/8/06, to test the use of CICS 3.1 in selected CICS Online Regions. They encountered too many problems to make CICS 3.1 the default in those Online Regions as planned. Additional testing in UCHIBETA has been scheduled for Tuesday, 8/22/06, during DCS Exclusive Use.

08/14/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 8/14/06, at 6:00 AM.

08/21/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 8/21/06, at 6:00 AM.

08/22/06

The Data Center’s Mainframe Systems Group had Exclusive Use of the UCHIBETA LPAR on Tuesday, 8/22/06, to test the use of CICS 3.1 in selected CICS Online Regions. As testing was successful, certain CICS regions will default to CICS 3.1 in BETA starting on Wednesday, 8/23/06. All other CICS Regions will default to the current Production level of CICS 2.2. Open Testing in BETA resumed on Wed, 8/23/06.

08/28/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 8/28/06, at 6:00 AM.

Back To Top

09/04/06

Monday, 9/4/06, was the Labor Day Holiday. We provided minimal Operator coverage for that 24-hour period consisting of one Operator per Shift. ALSO, on Monday, 9/4/06, we performed an IPL of the UCHIMVS1 (Production) LPAR at 6:00 AM.

09/06/06

The Data Center’s Mainframe Systems Group had Exclusive Use of the UCHIBETA LPAR on Wednesday, 9/6/06, to apply maintenance to ACF2 in support of their automated maintenance download facility. We also tested the application of routine maintenance to ESP 5.4. As all testing was successful, the maintenance will remain active in BETA and will be applied in Production during System Test Time on Sunday, 9/17/06. Open Testing in UCHIBETA resumed on Thursday, 9/7/06.

09/11/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 8/28/06, at 6:00 AM.

09/14/06

DCS’ Mainframe Systems Group had Exclusive Uuse of the UCHIBETA LPAR on Thursday, 9/14/06, to test procedures for migrating PUB Pack data to larger DASD volumes.

09/17/06

During System Test Time on Sunday, 9/17/06, we applied maintenance to ACF2 in support of our automated maintenance download facility. We also applied routine maintenance to our job scheduling package, ESP 5.4. All of this maintenance had been active in UCHIBETA since Thursday, 9/7/06.

09/20/06

DCS’ Mainframe Systems Group had Exclusive Use of the UCHIBETA LPAR on Wednesday, 9/20/06, to test CICS 3.1 Maintenance. Open Testing in BETA resumed on Thursday, 9/21/06, with CICS 3.1 Maintenance active.

09/24/06

During System Test Time on Sunday, 9/24/06, we applied Maintenance to DCS’ System Maintenance Program. This Maintenance had been tested in DCS’ TEST LPAR and its application in Production does not affect Mainframe users.

Back To Top

10/02/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 10/02/06, at 6:00 AM.

10/09/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 10/09/06, at 6:00 AM.

10/10/06

The Data Center had Exclusive Use of the UCHIBETA LPAR on Tuesday, 10/10/06, to test procedures for migrating data from 3390 Mod 3 to 3390 Mod 9. Open Testing in BETA resumed on Wed, 10/11/06.

10/16/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 10/16/06, at 6:00 AM.

ALSO, on Monday, 10/16/06, SAS 9.1.3 Service Pack 4 became the UCHIBETA default, replacing SAS 9.1.3 SP3 there. SAS 9.1.3 SP4 has been available for testing in both LPARs since 6/27/06. SAS 9.1.3 SP3 remains the default in the UCHIMVS1 (Production) LPAR.

10/19/06

The Data Center’s Mainframe Systems Group had Exclusive Use of the UCHIBETA LPAR on Thursday, 10/19/06, to test procedures for migrating data from 3390 Mod3 DASD to 3390 Mod9s. Open Testing in BETA resumed on Friday, 10/20/06.

10/22/06

During System Test Time on Sunday, 10/22/06, we migrated data from 3390 Mod3 DASD to newly initialized 3390 Mod9s. The migration did not affect Users’ ability to access cataloged data or DCS’ ability to perform backups and restores of datasets.

10/26/06

During System Test Time on Thursday, 10/26/06, from 6:00 until 7:30 AM we modified the new PUB009.

10/29/06

During System Test Time on Sunday, 10/29/06, we continued modifications to the VTOC for PUB009. After Test Time the Mainframe went to Central Standard Time.

Back To Top

11/06/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 11/06/06, at 6:00 AM.

11/12/06

During Hardware Test Time on Sunday, 11/12/06, IBM applied Maintenance to the IBM z800 Mainframe.

11/14/06

The Data Center’s Mainframe Systems Group had Exclusive Use of the UCHIBETA LPAR on Tuesday, 11/14/06, to continue testing data migration from 3390 Mod3 to other DASD configurations. Open Testing in UCHIBETA resumed on Wednesday, 11/15/06.

11/19/06

During System Test Time on Sunday, 11/19/06, we moved the locations of several Systems disk volumes to allow for future DASD configuration changes.

11/20/06

The failure of a job which initializes System DASD for the UCHIBETA LPAR failed on Monday morning, 11/20/06, delaying Open Testing in that LPAR until 9:15 AM.

11/21/06

The Data Center’s Mainframe Systems Group had Exclusive Use of the UCHIBETA LPAR on Tuesday, 11/21/06, to test z/OS 1.6 Maintenance. Open Testing in BETA resumed on Wednesday, 11/22/06. Maintenance on z/OS 1.6 will be available for Open Testing in the UCHIBETA LPAR beginning Tuesday, 11/28/06.

Thanksgiving Holiday 2006

Thursday, 11/23, and Friday, 11/24, were the 2006 Thanksgiving Holiday. We provided minimal Machine Room coverage of one Operator per shift across those 48 hours. UCHIBETA was available for Open Testing from 8:00 AM until 5:00 PM on both days.

11/27/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 11/27/06, at 6:00 AM.

11/28/06

Routine Maintenance to z/OS 1.6 was made available for Open Testing in the UCHIBETA LPAR on Tuesday, 11/28/06. This Maintenance had been tested in BETA during DCS Exclusive Use on 11/21/06 and will be applied in Production during System Test Time on Sunday, 12/17/06, 8:30 AM until 12:00 Noon.

Back To Top

12/04/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 12/04/06, at 6:00 AM.

12/11/06

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 12/11/06, at 6:00 AM.

12/17/06

During System Test Time on Sunday, 12/17/06, we applied routine Maintenance to z/OS 1.6 in Production. This Maintenance had been tested in the TEST and UCHIBETA LPARs and had been available for Open Testing in BETA since Tuesday, 11/28/06.

12/25/06

Monday, 12/25/06, was the Christmas Holiday. We maintained minimal Operator coverage in the 1155 E 60th Street Machine Room consisting of one Operator per shift. The UCHIBETA LPAR was available for Open Testing on Monday, 12/25/06. ALSO, on Monday, 12/25/06, we performed an IPL of the UCHIMVS1 (Production) LPAR at 6:00 AM.

Back To Top




Keywords:upgrades history   Doc ID:19423
Owner:Todd L.Group:University of Chicago
Created:2011-08-02 18:00 CSTUpdated:2013-09-03 09:26 CST
Sites:University of Chicago, University of Chicago - Sandbox
Feedback:  0   0