Mainframe - 2002 OS/390 Upgrades

This article explains the upgrades to the 2002 OS/390 mainframe.

01/01/02

All Online Regions were brought down by 5:30 PM on Mon, 12/31/01. From 8:00 PM Mon, 12/31/01, through 4:00 AM Wed, 01/02/02, the Mainframe ran unattended. TSO/ISPF was available and jobs not requiring Operator intervention ran. The UCHIBETA LPAR was not available on Tue, 01/01/02.

01/07/02

We had System Test Time on Monday, 01/07/02, from 6:00 until 7:00 AM.

01/12/02

Systems Group had exclusive use of the UCHIBETA LPAR on Friday, 1/11/02. Open Testing schedule resumed on Saturday, 1/12/02.

01/16/02

The Production Shop was open from 8:00 AM until 4:30 PM on Wed, 1/16. Normal schedule of 8:00 AM until 6:00 PM resumed on Thu, 1/17.

01/24/02

As of 1/24/02, IOF Version 7F is available for testing on both the UCHIMVS1 and UCHIBETA LPARs.

01/30/02

Systems Group had exclusive use of UCHIBETA on Wednesday, 1/30/02.

Back to top

02/10/02

During scheduled System Test Time on Sunday, 2/10/02, we installed the CICS Monitor MainView 5.5 in Production. We and a set of Computing Partners had been testing MainView on the UCHIBETA LPAR since 1/16/02. BETA was available on its normal Open Testing schedule of 8:00 AM until 4:00 PM on Sunday, 2/10/02.

02/11/02

On Monday, 2/11/02, we made the newest release of the ESP job scheduler (ESP 5.3) available for testing on the UCHIBETA LPAR. The Production Shop was responsible for testing those Production applications under its control. ESP 5.3 will be moved into Production later in February, following our testing period.

02/24/02

During System Test Time on Sunday, 2/24/02, we installed ESP 5.3 as the Production default.

02/25/02

IOF 7F became the default version of IOF on the UCHIBETA LPAR on Monday, 2/25/02. IOF 7E will remain the default on UCHIMVS1 with IOF 7F available for testing.

Back to top

03/10/02

During scheduled System Test Time on Sunday, 3/10/02, we installed IOF7F as the Production default.

03/11/02

Due to Staffing Schedules, the Production Shop hours for Monday, 3/11/02, were 8:00 AM until 4:30 PM.

03/12/02

QuickRef 5.8 became the Production Default on Tuesday, 3/12/02.

03/14-15/02

Due to Staffing Schedules, the Production Shop hours for Thursday, 3/14/02, and Friday, 3/15/02, were 8:00 AM until 4:30 PM. The Production Shop resumed its normal hours of 8:00 AM until 6:00 PM on Monday, 3/18/02.

03/14/02

APS had exclusive use of the UCHIBETA LPAR on Thursday, 3/14/02.

03/15/02

A Computing Partner was given exclusive use of the UCHIBETA LPAR on Friday, 3/15/02, to test an application upgrade procedure.

03/17/02

The Microcode upgrade for our IBM ESS disk array originally scheduled to be performed on Sunday, 3/17/02, was postponed. We will publish the new install date once it has been determined.

Back to top

04/01/02

We removed the remaining two Round-Reel tape drives from Mainframe service on April 1, 2002. Also on 4/1/02, SYNCSORT 3.7A became the default version in the UCHIBETA LPAR.

04/21/02

During System Test Time on Sunday, 4/21/02, we installed Syncsort Version 3.7A in Production. We also tested some FlashCopy Backup routines. The UCHIBETA LPAR was not available on Sunday, 4/21/02.

04/29/02

On Monday, 4/29/02, we began testing the ISPF feature RNEWS in the UCHIBETA LPAR.

Back to top

05/05/02

IBM performed a Microcode upgrade for our IBM ESS disk array on Sun, 05/05/02, starting at 7:00 AM. The upgrade was completed by 2:30 PM. This “concurrent” upgrade did not interfere with Mainframe or SAN processing on the ESS. The UCHIBETA LPAR was available for Open Testing on its normal schedule of 8:00 AM until 5:00 PM on Sunday, 05/05. (This was the new date for the Microcode Upgrade previously scheduled for Sunday, 3/17.)

05/08/02

On Wednesday, 5/8/02, we installed a minor change to a local ACF2 post-validation exit in the UCHIBETA LPAR. This change was suggested by a vendor in response to a one-time problem we experienced during initial FlashCopy testing in October, 2001.

05/19/02

On Sunday, 5/19/02, we installed a minor change to a local ACF2 post-validation exit. This change was suggested by a vendor in response to a one-time problem we noticed during initial FlashCopy testing and has been tested on the UCHIBETA LPAR since Wednesday, 5/8. The install did not require System Test Time and took effect following our standard Sunday IPL.

05/21/02

On Mon-Tue, 5/20-21/02, we began using FlashCopy to change the way we prepare support disks for the UCHIBETA LPAR and also to improve our method for performing Incremental and Full Disk Backups.

05/26/02

Starting Sunday, 5/26/02, the UCHIBETA LPAR will not be available on Sundays. We will be using the BETA disks to process Full and Offsite Disk Backups on Sundays.

05/27/02

Memorial Day Monday, 5/27/02, was the Memorial Day Holiday. The UCHIMVS1 LPAR ran unattended with TSO/ISPF available. Jobs not requiring Operator intervention could be run.

05/28/02

Due to Staff absence, the Production Shop closed at 4:30 PM on Tue, 5/28.

05/29/02

Due to Staff absence, the Production Shop closed at 5:00 PM on Wed, 5/29.

05/31/02

The annual NSIT Staff Picnic was held on Fri, 5/31, from 2:00 until 6:00 PM. The Mainframe ran unattended. UCHIBETA was available for Open Testing until 6:00 PM. Printed output was available when staffing resumed.

Back to top

06/07/02

Production Shop hours were 8:00 AM until 4:30 PM on Friday, 6/7/02.

06/09/02

During System Test Time on Sunday, 6/9/02, we installed RNEWS on the Production (UCHIMVS1) LPAR. RNEWS had been available on the UCHIBETA LPAR since 4/29/02.

06/17/02

We performed an IPL of the Mainframe on Monday, 6/17/02, at 6:00 AM.

06/21/02

Systems Group had exclusive use of the UCHIBETA LPAR on Friday, 6/21/02. We resumed our standard Open Testing schedule of 8:00 AM until 5:00 PM on Saturday, 6/22/02.

06/24/02

We performed an IPL of the OS390 Mainframe on Monday, 6/24/02.

06/24-07/12/02

Due to staff schedules, the Production Shop was open from 8:00 AM until 4:30 PM weekdays from Monday, 6/24/02, through Friday, 7/12/02, resuming its normal weekday schedule of 8:00 AM until 6:00 PM on Monday, 7/15/02.

06/26/02

Systems Group had exclusive use of the UCHIBETA LPAR on Wed., 6/26/02. We resumed our standard Open Testing schedule of 8:00 AM until 5:00 PM on Thursday, 6/27/02.

Back to top

07/01/02

We performed an IPL of the Mainframe at about 6:00 AM on Monday, 7/1/02. The IPL implemented a change made to a local Post-Validation exit to control very specific messages generated by a Production archive routine. We had tested this change in the UCHIBETA LPAR. The change can be backed out quickly without needing another IPL.

07/03/02

Systems Group had exclusive use of UCHIBETA on Wed, 7/3/02. We resumed our Open Testing schedule of 8:00 AM until 5:00 PM on Fri, 7/5/02.

07/04/02

Thursday, 7/4/02, was the Independence Day Holiday. For those 24 hours, UCHIMVS1 ran unattended: TSO/ISPF was available and jobs not requiring Operator intervention were run. UCHIBETA was not available on Thur, 7/4.

07/05/02

On Friday, 7/5/02, at the request of a Computing Partner group, the UCHIBETA LPAR was scheduled for Open Testing from 8:00 AM until 5:00 PM. No Exclusive Use of the BETA LPAR was granted that day.

07/08/02

We performed an IPL of the Mainframe on Monday, 7/8/02, at 6:00 AM. The IPL completed within 15 minutes.

07/14/02

During System Test Time on Sunday, 7/14/02, we installed maintenance on the System Maintenance Program.

07/15/02

On Monday, 7/15/02, we implemented two changes to tape processing in the UCHIBETA LPAR. First is an update to a local exit to protect the RMM database should an unlabeled cartridge be mounted in response to a request for an RMM controlled Scratch cartridge. (Manual safeguards have been in place since this problem was first discovered in March, 2002.) The second change corrects a recently discovered JCL logic error which allows processing of invalid /*SETUP cards for Over-The-Counter (OTC) volumes. CSM has tested both of these changes during exclusive testing on the UCHIBETA LPAR. Following two weeks in BETA, these changes will be installed in the Production (UCHIMVS1) LPAR on Monday, 7/29.

07/17/02

On Wednesday, 7/17/02, Systems Group had exclusive use of the UCHIBETA LPAR. Open Testing resumed on Thursday, 7/18/02, from 8:00 AM until 7:00 PM.

07/18/02

The UCHIBETA LPAR was available until 7:00 PM (19:00) on Thursday, 7/18/02, at the request of a Computing Partner group. We resumed our normal Open Testing hours of 8:00 AM until 5:00 PM on Friday, 7/19.

07/22/02

We performed an IPL of the Mainframe on Monday, 7/22/02, at 6:00 AM.

07/23/02

A Computing Partner group was given exclusive use of the UCHIBETA LPAR on Tuesday, 7/23/02. The testing required additional IPLs and a change in Machine Date. Open Testing in BETA resumed on Wednesday, 7/24.

07/26/02

At the request of a Computing Partner group, the UCHIBETA LPAR was available for Open Testing with no Exclusive Use allowed on Friday, 7/26/02.

07/28/02

During Test Time on Sun, 7/28, we reorganized and moved the RMM database and IPLed the Mainframe. Two changes took effect with the IPL: An update to a local exit to protect the RMM database should an unlabeled cartridge be mounted in response to a request for an RMM controlled Scratch cartridge; A correction to a recently discovered JCL logic error which allows processing of invalid /*SETUP cards for Over-The-Counter (OTC) volumes.

Back to top

08/02/02

At the request of a Computing Partner group, the UCHIBETA LPAR was available for Open Testing with no Exclusive Use allowed on Friday, 8/02/02.

08/05/02

We performed an IPL of the Mainframe on Monday morning, 8/5, at 6:00 AM.

08/07/02

CSM Systems Group had Exclusive Use of the UCHIBETA LPAR on Wed, 8/7/02. Open Testing resumed on Thur, 8/8/02, 8:00 AM until 5:00 PM.

08/12/02

We performed an IPL of the Mainframe on Monday, 8/12 at 6:00 AM.

08/14/02

We applied maintenance to OS390 2.8 on the UCHIBETA LPAR on Wednesday, 8/14/02, for Open Testing. This maintenance had been tested on both the TEST and BETA LPARs by our Systems Group but we invited our Computing Partners to test their mission-critical applications.

Also on 8/14, we made an upgrade of the TSO Superset Utilities available for testing on BETA. These Utilities provide TSO commands to manipulate programs, data and job output from a TSO terminal.
On Thursday, 8/15, we went back to our “standard” version of UCHIBETA.

08/19/02

We performed an IPL of the Mainframe on Monday, 8/19/02, at 6:00 AM.

08/25/02

We completed a Microcode upgrade on our IBM ESS disk array on Sunday, 08/25/02. This “concurrent” upgrade did not interfere with Mainframe or SAN processing on the ESS.

08/26/02

We performed an IPL of the Mainframe on Monday, 8/26/02, at 6:00 AM.

08/28-31/02

We applied maintenance to OS390 2.8 on the UCHIBETA LPAR on Wednesday, 8/28/02, for Open Testing through Saturday, 8/31/02. This maintenance had been tested on both the TEST and BETA LPARs by our Systems Group and by Computing Partners during Open Testing in the BETA LPAR on Wednesday, 8/14, but our Computing Partners were invited to test their applications during this 4-day period.

At the same time, we made an upgrade of the TSO Superset Utilities available for testing on BETA. These Utilities provide TSO commands to manipulate programs, data and job output from a TSO terminal. The Utilities contain 10 TSO commands (COPY, COMPARE, FORMAT, FSHELP, LIST, LISTDDN, LISTJES, MERGE, PRINTDS, TSOSORT) and 3 subcommands of TSO EDIT (MERGE, FORMAT, TSOSORT).

08/29/02

During System Test Time on Thursday, 8/29/02, we reconfigured support for new Operator Consoles.
08/30/02 Production Shop services were available from 8:00 AM until 4:30 PM on Friday, 8/30. We resumed normal coverage of 8:00 AM until 6:00 PM on Tuesday, 9/3, following the Labor Day Holiday.

Back to top

09/01/02 During System Test Time on Sunday, 9/1/02, we applied Maintenance to OS390 2.8 and upgraded the TSO Superset Utilities. The Utilities contain 10 TSO commands (COPY, COMPARE, FORMAT, FSHELP, LIST, LISTDDN, LISTJES, MERGE, PRINTDS, TSOSORT) and 3 subcommands of TSO EDIT (MERGE, FORMAT, TSOSORT). The Maintenance and Upgrade had been available for Open Testing in the UCHIBETA LPAR from Wednesday through Saturday, 8/28-31/02.

Back to top

09/02/02

Monday, 09/02, was the Labor Day Holiday. The UCHIMVS1 (Production) LPAR ran unattended: TSO/ISPF was available and jobs not requiring Operator Intervention could be run. UCHIBETA was not available.

09/09/02

We performed an IPL of the Production (UCHIMVS1) LPAR on Monday, 9/9/02, at 6:00 AM.

09/11/02

We performed an IPL of the UCHIMVS1 (Production) LPAR on Wednesday, 9/11/02, at 6:00 AM to activate certain software license renewals.

09/16/02

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 9/16/02, at 6:00 AM.

09/18/02

On Wednesday, 9/18/02, we made the ESP External Security Interface the default in the UCHIBETA LPAR. Currently in Production (UCHIMVS1), ESP uses its own internal security model: If you want to use ESP we have to define you to the product independently of ACF2; Access to ESP objects is usually controlled by the “owner” of the event (usually the last person who edited the event). The ESP External Security interface in UCHIBETA now uses ACF2 Resource Rules to control access to ESP objects such as Events, Calendars, Symbol Libraries, Resources, Applications, etc. Anyone known to ACF2 will be able to use ESP under their own LogonID in BETA. Access to ESP objects as well as datasets will be controlled by the Event prefix. Example: Under ESP Internal Security (still in effect in the UCHIMVS1 LPAR), Event XPS.TRY_THIS owned by XPSJIML runs under XPSJIML authority. Under External Security in the UCHIBETA LPAR as of 9/18/02, this Event runs under XPS authority. Please send questions and feedback to Jim Lichtenstein. NOTE: On Tuesday, 6/03/03, we attempted to make ESP External Security the Production default. Despite extended testing in the UCHIBETA LPAR, we encountered a problem using ESP external security in the UCHIMVS1 (Production) LPAR. On Wednesday, 6/04/03, ESP External Security was removed as the Production default in the UCHIMVS1 LPAR. On Thursday, 6/05/03, ESP External Security was removed as the default on the UCHIBETA LPAR. We have switched back to internal security in both Mainframe LPARs while we analyze the problem. UPDATE: The problem encountered on Tuesday, 6/3, was with an incorrectly set parm which has now been reset. ESP External Security was activated in the UCHIBETA LPAR on Tuesday, 6/10/03 and became the Production default on Monday, 6/16/03.

09/23/02

We did not perform an IPL of the UCHIMVS1 (Production) LPAR on Monday, 9/23/02. The IPL will be rescheduled.

09/23-28/02

A Computing Partner Group requested that Open Testing be available on the UCHIBETA LPAR for the week of Monday through Saturday, 9/23-28/02. No Exclusive Use of the BETA LPAR was allowed on those days.

09/29/02

We performed an IPL of the UCHIMVS1 (Production) LPAR on Sunday, 9/29/02.

Back to top

10/01/02

We scheduled Exclusive Use of the UCHIBETA LPAR for Data Center Services personnel on Tuesday, 10/1/02. Other sessions and jobs were subject to cancellation without notice according to the needs of Data Center Services personnel. Normal Open Testing on BETA from 8:00 AM until 5:00 PM resumed on Wednesday, 10/2.

10/07/02

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 10/7/02, at 6:00 AM.

10/09/02

We experienced a failure of IP PrintWay while trying to print remotely to UHRM. Thsi failure also affected our ability to print to Mott. An IPL was scheduled for the morning of Thursday, 10/10/02, to attempt to recover remote printing ability.

10/10/02

Following this morning’s IPL of the UCHIMVS1 LPAR, we were able to direct jobs to print remotely at Mott. However, an alert Operator noticed an unfamiliar PrintWay message on a console in the Computer Room and brought it to our System Group’s attention. This message was the result of our testing a “response notification” exit. With the exit in place, we requested a retry of the UHRM job which appeared to have “caused” yesterday’s failure. This attempt resulted in another failure of IP PrintWay. We then removed the response notification exit, restarted PrintWay, and successfully printed the UHRM job remotely. Systems Group will be investigating the exit. In the meantime, remote printing from the Mainframe is enabled.

10/14/02

We performed an IPL of the Production (UCHIMVS1) LPAR on Monday, 10/14/02, at 5:00 AM.

10/14/02

On Monday, 10/14/02, we made Version 3.0.2 of the VSAM enhancer VSAM I/O PLUS the default in the UCHIBETA LPAR. Please take this opportunity to test the new VSAM I/O PLUS before it becomes Production. (The current Production version is 2.2.3.)

VSAM I/O Plus has been renamed to Performance Essential in version 3.0.2. Performance Essential 3.0.2 helps to optimize buffer allocations for VSAM data sets automatically without any programmer involvement. It significantly reduces EXCP counts, which frees channel and CPU resources for other tasks. This release of Performance Essential has enhanced performance for VSAM sequential processing.

If you encounter problems while testing Performance Essential 3.0.2 please contact helen seren and Todd Last. If all goes well with testing, we will install Performance Essential 3.0.2 in Production (UCHIMVS1 LPAR) on Sunday, 10/27/02.

10/21/02

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 10/21/02, at 6:00 AM.

10/22/02

Production Shop hours for Tuesday, 10/22/02, were 8:00 AM until 4:30 PM. We resumed our normal schedule of 8:00 AM until 6:00 PM on Wednesday, 10/23.

10/27/02

During System Test Time on Sunday, 10/27/02,we installed Performance Essential 3.0.2 (AKA VSAM I/O PLUS) in Production. VSAM I/O Plus has been renamed to Performance Essential in version 3.0.2. Performance Essential 3.0.2 helps to optimize buffer allocations for VSAM data sets automatically without any programmer involvement. It significantly reduces EXCP counts, which frees channel and CPU resources for other tasks. This release of Performance Essential has enhanced performance for VSAM sequential processing. Performance Essential 3.0.2 had been available for testing in the UCHIBETA LPAR since Monday, 10/14/02.

10/29/02

On Tuesday, 10/29/02, we applied maintenance required for OS390 2.10 to Compuware’s Started Task XChange on the UCHIBETA LPAR. XChange allows us to set alternate dates in online transactions for testing purposes. The use of XChange in batch processing will not be affected. If all goes well with testing in UCHIBETA, the maintenance will be applied to XChange in Production the week of 11/10/02. Also on Tuesday, 10/29/02, Release 7G of the Interactive Output Facility (IOF) became available for testing on both the UCHIMVS1 (Production) and UCHIBETA LPARs.

Back to top

11/01/02

The Production Shop was “open” from 8:00 AM until 4:30 PM on Friday, 11/01/02. We resumed normal hours (8:00 AM until 6:00 PM) on Monday, 11/04/02.

11/03/02

During System Test Time on Sunday, 11/03/02, we configured Operator Console settings.

11/11/02

We performed an IPL of the UCHIMVS1 (Production) LPAR on Monday, 11/11/02. Also on 11/11/02, IOF 7G became the default in the UCHIBETA LPAR. IOF 7G was still available for testing in the UCHIMVS1 (Production) LPAR. IOF 7G was available for testing on both LPARs since 10/29/02.

11/13/02

On Wednesday, 11/13/02, we applied maintenance required for OS390 2.10 to Compuware’s Started Task XChange in the Production (UCHIMVS1) LPAR. This maintenance was available for testing on the UCHIBETA LPAR since 10/29/02. XChange allows us to set alternate dates in online transactions for testing purposes. The use of XChange in batch processing has not be affected.
ProdShop Schedule

11/13-12/3/02

Due to Staff Schedules, the Production Shop was “open” from 8:00 AM until 4:30 PM from Wednesday, 11/13/02, through Tuesday, 12/3/02. Coverage after 4:30 PM was available on request. We resumed our normal hours of 8:00 AM until 6:00 PM on Wednesday, 12/4/02.

11/18/02

We performed an IPL of the UCHIMVS1 (Production) LPAR for Monday, 11/18/02, at 6:00 AM.

11/19/02

We performed an IPL of the UCHIMVS1 (Production) LPAR on Tuesday, 11/19/02, at 6:00 AM. We made OS390 2.10-related additions to OMVS. Also on 11/19/02, we needed to IPL the UCHIMVS1 LPAR twice. The first because ACF2 cancelled OMVS (which then brought down TCP/IP) after repeated security violations while attempting to mount a new file structure, the second because of a filled hardcopy console buffer due to the messages generated by the first problem. The ACF2-OMVS problem has been addressed

11/20/02

Mainframe MAIL has been corrected to display the proper Time Zone shift from GMT on outgoing messages as of Wednesday, 11/20/02. Eudora should now correctly sort these messages within date sent.

11/24/02

During System Test Time on Sunday, 11/24/02, we prepared new versions of Compuware Xpediter/CICS and AbendAid/CICS for testing in the UCHIBETA LPAR, effective Monday, 11/25/02.

11/25/02

As of Monday, 11/25/02, Compuware Xpediter/CICS Version 7.4 and Compuware AbendAid/CICS Version 4.3 are available for testing in the UCHIBETA LPAR. Production versions remain at Xpediter/CICS 7.2 and AbendAid/CICS 4.2. AbendAid/CICS and Xpediter/CICS are both meant specifically for use with CICS programs. We also upgraded Compuware’s Shared Services Load Library from the Production CSS 7.7 to the UCHIBETA testing CSS 7.9. If all goes well with testing, we expect to install these new versions in Production in early December, 2002.

11/28-29/02

Thursday and Friday, 11/28-29/02 were the University Thanksgiving Holiday dates. The UCHIMVS1 (Production) LPAR ran unattended for the 48 hours from Midnght Wednesday night, 11/27, through Midnight Saturday morning, 11/30. TSO/ISPF was available and jobs not requiring Operator intervention could be run. Printouts were not available until staffing resumed. The UCHIBETA LPAR was not available on Thursday or Friday, 11/28-29.

Back to top

12/03/02

During System Test Time on Tuesday, 12/3/02, we adjusted unit addresses for some non-Production disk volumes.

12/06/02

NSIT’s annual Holiday Party took place on Friday, 12/06/02, from 3:00 until 7:00 PM. Both the UCHIMVS1 and UCHIBETA LPARs were run unattended during that time: TSO/ISPF was available and jobs not requiring Operator intervention were run on both LPARs. UCHIBETA was available until 7:00 PM on Friday, 12/6. The Production Shop closed at 3:00 PM that day.

12/08/02

We canceled System Test on Sunday, 12/8/02. The install of IOF7G in Production has been postponed.

12/15/02

During System Test Time on Sunday, 12/15/02, we installed IOF 7G, Compuware Xpediter/CICS Version 7.4 and Compuware AbendAid/CICS Version 4.3 in Production. IOF 7G had been available for testing in both LPARs since 10/29 (and had been the default in UCHIBETA since 11/11); both Compuware products had been available for testing in UCHIBETA since 11/25. We also upgraded Compuware’s Shared Services Load Library from CSS 7.7 to CSS 7.9.

12/19/02

During System Test Time on Thursday, 12/19/02, we configured new Operator consoles.

12/20/02

DCS’ Systems Group had Exclusive Use of the UCHIBETA LPAR on Friday, 12/20/02, to test IPL Procedures for the new IBM Z800 Mainframe. Open Testing on BETA resumed on Saturday, 12/21.

12/23/02

We performed an IPL of the UCHIMVS1 (Production) LPAR on Mon, 12/23, at 6:00 AM. Also, DCS’ Systems Group had Exclusive Use of the UCHIBETA LPAR on Mon, 12/23, to test Tape and Print functions on the new IBM Z800 Mainframe. Open Testing on BETA resumed on Tue, 12/24.

12/23-24/02

The Production Shop was “open” from 8:00 AM until 4:30 PM on Mon and Tue, 12/23-24/02, and resumed its normal hours of 8:00 AM until 6:00 PM on Thu, 12/26/02, following the Christmas Holiday.

12/24/02

At the request of a Computing Partner group, the UCHIBETA LPAR was available for Open Testing (no Exclusive Use allowed) on Tuesday, 12/24/02.

12/25/02

Wed, 12/25/02, was the Christmas Holiday. For the 32 hours from 8:00 PM Tue, 12/24, through 4:00 AM Thu, 12/26/02, the UCHIMVS1 LPAR ran unattended: TSO/ISPF was available and jobs not requiring Operator intervention were run. The UCHIBETA LPAR was not be available on Wed, 12/25/02.

12/26-27/02

At the request of two Computing Partner Groups, the UCHIBETA LPAR was available for Open Testing on Thursday and Friday, 12/26-27/02.

12/30/02

We performed an IPL of the UCHIMVS1 (Production) LPAR on Mon, 12/30, at 6:00 AM. Also on Mon, 12/30, DCS’ Systems Group had Exclusive Use of the UCHIBETA LPAR to test Print functions on the new IBM Z800 Mainframe. Open Testing on BETA resumed on Tue, 12/31.

12/31/02

At the request of two Computing Partner groups, the UCHIBETA LPAR was available for Open Testing (no Exclusive Use allowed) on Tuesday, 12/31/02.

Back to top




Keywords:history archive   Doc ID:19401
Owner:Todd L.Group:University of Chicago
Created:2011-08-02 18:00 CSTUpdated:2013-03-07 08:06 CST
Sites:University of Chicago, University of Chicago - Sandbox
Feedback:  0   0