Jan, 2001

During the month of January, 2001, Central Servers and Mainframes’ Systems Group had exclusive use of the UCHIBETA LPAR for OS390 2.8 testing on the following days:

Wednesday 01/03/01
Friday 01/05/01
Tuesday 01/09/01
Thursday 01/11/01
Tuesday 01/16/01
Thursday 01/18/01
Tuesday 01/23/01
Thursday 01/25/01
Tuesday 01/30/01

01/07/01

We used scheduled System Test Time on the IBM OS390 Mainframe (both the UCHIMVS1 and UCHIBETA LPARs) on Sunday, 01/07/01, from 7:00 until 10:00 AM to prepare for future OS390 2.8 Open Testing periods on the UCHIBETA LPAR. The UCHIBETA LPAR (with the current OS390 2.5) was available on Sunday, 1/7, from 10:00 AM until 4:00 PM. 01/17/01 We brought the Mainframe Removable Media Manager (RMM) down on Wednesday, 1/17, from Noon to 1:00 PM. No jobs using RMM-controlled cartridges were run during that period. ISPF RMM Panels were not available. We renamed and relocated the RMM Database and Journal datasets as part of an ongoing project to standardize our System files.

01/21/01

During scheduled System Test Time on the IBM OS390 Mainframe on Sunday, 1/21/01, we prepared for testing new pooling and budgeting software for OS390 2.8 on UCHIBETA.

01/28/01 We scheduled System Test Time on the IBM OS390 Mainframe on Sunday, 1/28/01, from 6:00 until 8:00 AM. The UCHIBETA LPAR was available on its normal schedule of 8:00 AM until 4:00 PM on Sunday, 1.28.

Feb, 2001

During the month of February, 2001, Central Servers and Mainframes’ Systems Group had exclusive use of the UCHIBETA LPAR for OS390 2.8 testing on the following days:
Thursday 02/01/01
Tuesday 02/06/01
Thursday 02/08/01
Tuesday 02/13/01
Thursday 02/15/01
Tuesday 02/20/01
02/16/01

We needed to IPL the IBM Mainframe around Noon Friday, 2/16/01, when the page dataset which contains PLPA became full. PLPA stands for Pageable Link Pack Area which contains, among other items, copies of often-used programs pre-loaded into memory at IPL time. We then defined a new, larger dataset for the PLPA. We also added one to the “total possible page datasets” count. These changes will take effect at the next IPL, now scheduled for Sunday, 2/18.

However, the Noon IPL on Friday, 2/16, introduced a change in an ACF2 field which negated our DASD Pooling rules resulting in datasets being directed to the “wrong” disk packs and in departments exceeding their budgets. Some of that night’s scheduled Production was delayed while the problem was analyzed and solved. The Mainframe was IPLed at about 2:00 AM on Saturday, 2/17, and processing was resumed.

02/17/01

Delays in scheduled Production caused by problems with the Mainframe System prevented our running the jobs which support the daily refresh of the UCHIBETA LPAR on Saturday morning, 2/17. Therefore, the UCHIBETA LPAR was not available on Saturday, 2/17.

02/18/01

During scheduled Hardware Test Time on the IBM Mainframe Sunday, 2/18/01, we installed an upgrade to the microcode on the IBM ESS Disk. We also installed FlashCopy, the new software we will use for copying the Production disk farm under OS390 2.8. Once we have installed OS390 2.8 as the Production Operating System, our use of FlashCopy will greatly reduce the amount of time we now dedicate to copying the Production disks for the daily refresh of the UCHIBETA LPAR. The UCHIBETA LPAR was not available on Sunday, 2/18/01.

02/21/01

There was insufficient time to run the copy jobs which prepare UCHIBETA DASD Wednesday morning, 2/21/01. UCHIBETA was not available Wednesday, 2/21/01.
02/22/01 Systems Group cancelled their exclusive use of the UCHIBETA LPAR on Thursday, 02/22/01. UCHIBETA was available for Open Testing on that day.

02/23/01

We scheduled System Test Time Friday, 2/23/01, from 6:30 to 7:30 AM. UCHIBETA was available from 8:00 AM until 4:00 PM Fri, 2/23.
March, 01 During the month of March, 2001, Central Servers and Mainframes’ Systems Group had exclusive use of the UCHIBETA LPAR for OS390 2.8 testing on the following days:
Thursday 03/08/01
Monday 03/12/01
Tuesday 03/13/01

03/14/01

Effective Wednesday, 3/14, the default Operating System for Open Testing on the UCHIBETA LPAR was OS390 2.8 (unless OS390 2.5 was requested).

03/21/01

On Wednesday, 3/21/01, OS/390 2.5 was available on the UCHIBETA LPAR.

03/29/01

One DP96 Printer and one impact printer were available on the UCHIBETA LPAR on Thursday, 3/29/01.

04/02/01

On Monday, 04/02/01, UCHIBETA was available for Open Testing of OS/390 2.8 from 8:00 AM until 8:00 PM but without DBCOAS or DBFS2 running and without printing services.

04/04/01

One Xerox DP96 Printer and one impact printer will be available on the UCHIBETA LPAR Wednesday, 4/4. (We will make every effort to have these devices allocated to UCHIBETA for the entire OS/390 2.8 Open Testing period but in the case of hardware problems, Production demands must take priority.)

Please NOTE that once a printer is allocated to UCHIBETA, all jobs eligible to print on that device will be printed. If you do not wish to have the output from a particular job print, please set that job to a non-print MSGCLASS.

04/18/01

Mail server running in the UCHIBETA LPAR to allow testing of processes which send mail.

04/22/01

OS/390 2.8 was not installed into production during morning test time. OS/390 2.5 is still the Production Operating System. The UCHIBETA LPAR was not available.

04/23/01

The UCHIBETA LPAR will not be available on Monday, 4/23.

04/26/01

Systems Test Time Thursday 4/26 from 6:00 to 7:30 AM

BETA normal schedule

05/01/01

During the month of May, 2001, Central Servers and Mainframes’ Systems Group had exclusive use of the UCHIBETA LPAR for OS390 2.8 testing on the following days:
Tuesday 05/01/01
Thursday 05/03/01
Monday 05/14/01
Monday 05/21/01

05/08/01

Systems temporarily running OS/390 2.8 in as near to Production conditions as we can obtain in the BETA LPAR.

BETA available before noon for testing.

05/11/01

On Friday, 5/11/01, we performed a simulated “Production” installation of OS/390 2.8 on the UCHIBETA LPAR. We installed OS/390 2.8 on the actual Systems Residence volumes for UCHIBETA and IPLed from there. UCHIBETA was available for Open Testing.

05/20/01

System Test Time 7:00AM until 12:00 Noon. We installed OS390 2.8 into production. New versions of auxiliary software were also installed: ACF2 6.3, JES2 2.8, ISPPF 2.8, TPX 5.0, OPSMVS 4.3, IOF 7E, Output Master 1.4.1, Syncsort 3.7.

UCHIBETA LPAR was not available for open testing.

05/28/01

We were closed for the Memorial Day holiday.

06/01/01

The NSIT Staff Picnic, originally scheduled for Friday, 6/1, was postponed due to the threat of inclement weather. Full operator coverage was available for the entire day of Friday, 6/1. Also, the UCHIBETA LPAR schedule reverted to standard hours: 8:00 AM until 4:00 PM. We have tentatively rescheduled the NSIT Staff Picnic for Friday, 6/15.

06/07/01

System Test Time on the IBM Mainframe from 6:00 until 7:30 AM.

06/10/01

During hardware Test Time on the IBM Mainframe from 4:00AM until Noon, we installed new microcode and fiber channel support on the IBM ESS storage. The UCHIBETA LPAR was not available.

06/15/01

NSIT Staff Picnic took place from 2:00 until 6:00 PM. During that time, the IBM Mainframe was running unattended: ISPF/TSO was available; all scheduled online regions were up; the UCHIBETA LPAR was available until 6:00 PM; jobs not requiring Operator intervention were run in both UCHIMVS1 and UCHIBETA LPARs; but no output was printed at the 1155 E 60th Street Computer Room until after 6:00 PM.

06/21/01

Systems installed Version 7.0 of the bebugging aid XPEDITER on the IBM OS390 Mainframe during Test Time 6:00 AM to 7:30 AM.

06/21/01

A successful emergency IPL of the Mainframe was performed at 12:00 noon. When the Mainframe was IPLed following Test Time this morning (see above) an incorrect response was made to a system prompt early in the procedure. The result was that UCHIMVS1 began operating with system parameters which are used in the TEST LPAR (NOTE: this is not UCHIBETA).

We believe that this error only affected our own internal processes.

07/01/01

Hardware upgrade of the ESS Disk Array from E20s to F20s for improved performance took place during Test Time from 4:00 AM until 12:00 Noon.

07/01/01

XREFPLUS, a JCL and procedure documentation and cross-reference utility which enables one to determine how your installation’s JCL or PROC libraries are using datasets, programs, PROCs, catalogs, DASD, and was valuable in some transition work was removed from production.

07/01/01

OS/VS COBOL, an obsolete version of COBOL was removed. A more current version of COBOL is in production.

07/04/01

We closed for the 4th of July holiday.

08/03/01

UCHIBETA was available for Open Testing from 10:00 AM until 4:00 PM. Systems reserved it for testing from 08:00AM until 10:00AM.

08/09/01

During System Test Time on Thursday, 8/9/01, we installed the DASD fix supplied by IBM to correct a problem we encountered only while using the VSAM enhancer “VSAM I/O PLUS” on one specific VSAM data set.

08/21/01

During System Test Time 6:00 to7:30 AM. we applied IBM maintenance specifically required for the FLASHCOPY function. After it has been applied to the production system, we will able to complete our FLASHCOPY testing.

08/21/01

Two round reel tape drives were taken out of service. Two drives on two different channels remain.

08/26/01

During System Test Time Sunday, 8/26/01, from 7:00 until 10:00 AM, we installed SAS Version 8.2 as the Production default, leaving SAS Version 6.09E on the system for on month. Please follow this link to our SAS information page. We also installed FDR Version 5.3 Level 57 as the Production default.

09/03/01

We were closed for the Labor Day holiday Monday September 3, 2001.

09/04/01

Our Systems Group had exclusive use of the UCHIBETALPAR on Tuesday, 9/4/01. We resumed Open Testing on its normal schedule on Wednesday, 9/5.

09/21/01

Our Systems Group had exclusive use of the UCHIBETA LPAR on Friday, 9/21/01.

09/24/01

The ACF2 Service Pack 4 maintenance upgrade was available for Open Testing on the UCHIBETA LPAR from Wednesday through Friday, 9/12-14/01. There were no reports of problems. We installed ACF2 Service Pack 4 in Production Sunday 9/23/01 during System Test Time.

10/11/01

Systems Group had exclusive use of the UCHIBETA LPAR on Thursday, 10/11/01, to test the newest maintenance upgrade to OS390 2.8.

10/14/01

During Test Time on Sunday, 10/14, we tested FlashCopy. The UCHIBETA LPAR was available from Noon until 4:00 PM using disks copied from Production using the FlashCopy feature on the ESS Disk Array. We resumed our current disk preparation procedures for UCHIBETA on Monday, 10/15.

10/16/01

We had System Test Time on Tuesday, 10/16, from 6:00 until 7:30 AM.

10/18/01

Systems Group had exclusive use of the UCHIBETA LPAR on Thursday, 10/18/01, to test the newest maintenance upgrade to OS390 2.8.

10/21/01

During Test Time on Sunday, 10/21/01, we continued testing FlashCopy. The UCHIBETA LPAR was available from 2:30 until 4:00 PM using disks copied from Production using the FlashCopy feature on the ESS Disk Array. We resumed our current disk preparation procedures for UCHIBETA on Monday, 10/22.

10/24-26/01

We provided an opportunity to test the OS390 2.8 Maintenance Upgrade on the UCHIBETA LPAR from Wednesday through Friday, 10/24-26, between 8:00 AM and 4:00 PM.

10/28/01

During scheduled Test Time on Sunday, 10/28/01, we continued testing Production FlashCopy routines. The UCHIBETA LPAR was available from Noon until 4:00 PM using disks copied from Production using the FlashCopy feature on the ESS Disk Array. We resumed our current disk preparation procedures for UCHIBETA on Monday, 10/29.

10/29/01

The OS390 2.8 Maintenance Upgrade was available for Open Testing on the UCHIBETA LPAR on Monday, 10/29, 8:00 AM until 4:00 PM.

10/30/01

Systems Group had exclusive use of the UCHIBETA LPAR on Tuesday, 10/30, to test Production installation procedures for the OS390 2.8 Maintenance Upgrade.

10/31/01

We performed an IPL of the Mainframe on Wed., 10/31/01, at 6:00 AM.

10/31-11/02

The OS390 2.8 Maintenance Upgrade was available for Open Testing on the UCHIBETA LPAR on Wednesday through Friday, 10/31-11/02.

11/01/01

The UCHIBETA LPAR was available for Open Testing until 6:00 PM with all onlines active on Thursday, 11/01/01.

11/04/01

During System Test Time on the IBM Mainframe on Sunday, 11/4, we installed the OS390 2.8 Maintenance Upgrade in Production. The Upgrade had been available for Open Testing on the UCHIBETA LPAR weekdays since 10/24.

The UCHIBETA LPAR was not available for Open Testing on Sunday, 11/4.

11/09/01

We performed an IPL of the Mainframe on Friday, 11/9/01, at 6:00 AM, to increase the number of available TPX Ports.

11/11/01

During System Test Time on Sunday, 11/11, we installed the latest maintenance release of FDR software, Version 5.3 Level 59, in Production. FDR V5.3 L59 includes FDR InstantBackup.

The UCHIBETA LPAR (with FDR V5.3 L57) was available for Open Testing on Sunday, 11/11, from 8:00 AM until 4:00 PM. FDR V5.3 L59 is available on BETA as of Monday, 11/12.

11/18/01

During Test Time on Sunday, 11/18/01, we continued testing Production routines using FDR InstantBackup and FlashCopy. The UCHIBETA LPAR was available after Test Time using disks prepared by FlashCopy.

11/19-21/01

The UCHIBETA LPAR was available for Open Testing from 8:00 AM until 5:00 PM on Mon through Wed, 11/19-21.

Thanksgiving Thursday and Friday, 11/22-23, were the University Thanksgiving Holiday for 2001. The UCHIBETA LPAR was not available for Open Testing on Thu and Fri, 11/22-23, and resumed its normal schedule on Sat, 11/24.

11/27/01

Systems Group had exclusive use of the UCHIBETA LPAR on Tuesday, 11/27/01. We resumed our normal schedule for Open Testing on BETA on Wednesday, 11/28.

11/29/01

We performed an IPL on Thursday, 11/29/01, to apply additional resources to TCPIP.

12/02/01

We scheduled Mainframe Test Time on Sunday, 12/2/01, to continue our testing of Production routines in support of FDR InstantBackup and FlashCopy. The UCHIBETA LPAR was available after Test Time until 4:00 PM using disks prepared by FlashCopy. Standard UCHIBETA preparations and schedule resumed Monday, 12/3.

12/04/01

Systems Group had exclusive use of the UCHIBETA LPAR on Tuesday, 12/4.

12/06/01

We had System Test Time on Thursday, 12/6, from 6:00 until 7:00 AM.

12/14/01

The Annual NSIT Holiday Party was held on Friday, 12/14/01, from 3:00 until 7:00 PM. The IBM Mainframe (UCHIMVS1 and UCHIBETA LPARS) ran unattended during that time.

Christmas

Holiday All Online Regions were brought down by 5:30 PM on Mon, 12/24. From 8:00 PM Mon, 12/24, through 4:00 AM Wed, 12/26, the Mainframe ran unattended. TSO/ISPF was available and jobs not requiring Operator intervention ran. The UCHIBETA LPAR was not available on Tue, 12/25.

12/26/01

ProdShop staffed from 8:00 until 4:30 (with lunch at 1:00) on Wed, 12/26/01. We resumed our normal schedule of 8:00 AM until 6:00 PM on Thu, 12/27/01.




Keywords:history   Doc ID:19398
Owner:Todd L.Group:University of Chicago
Created:2011-08-02 18:00 CSTUpdated:2013-02-14 10:41 CST
Sites:University of Chicago, University of Chicago - Sandbox
Feedback:  0   0